Sentinel Media records · public agendas and minutes, text only, refreshed nightly from each body's own site · not a newspaper

City of Shelley

Minutes - May 28, 2026 Work Meeting

minutes meeting date 2026-05-28 · fetched 2026-09-17 · 2460 characters · read by OCR, check numbers against the source · official file · plain text

CITY OF SHELLEY
WORK MEETING MINUTES

MAY 28, 2026

PRESENT: Mayor Westergard, Councilman Kress, Councilman Watson, Councilwoman Street,
Justin Johnson, Jordon Johnson, Dave Noel, Spence Ward, and Ted Hendricks

The meeting was called to order at 5:42 p.m.

SUBSITUTE USAGE RATE

The Mayor and Council discussed the proposed temporary flat water flow rates that Spence
drafted. The chart bases the flat rate on the size of the property owners’ lot and will be used
during the interim of having all of the meters installed. All of the businesses that currently have
meters will still be read but the businesses based on light, medium, or heavy usage will follow
the chart being proposed. The Council discussed if the residential property owners should be
charged for metered rates after one year of monitored usage or if everyone will wait to pay
metered rates until one year after all of the meters have been installed. Some residents will
have approximately four years of usage but other may only have one year to see how much
water they are actually using. Sean said the metered rates should begin being billed one year
after the last meter is installed. However, the businesses that do not currently have meters will
begin to be billed metered rates 30 days after the meter is installed. It was discussed that the
flat usage rates are very comparable to the current existing rates. A copy of the proposed rate
table is attached. A public hearing is needed to establish this new fee. At the public hearing
this table will be considered for adoption for a temporary substitute usage rate will be
considered in lieu of the actual flow rates. A hearing will be held and the council proposed this
rate should be in place August 1, 2026. The meter rate of $1.75 per thousand was previously
adopted but will not be effective until August 1, 2026,

ERU TABLE

Dave said in October he will be able to provide an ERU table for the businesses and schools for
their base rate. He said this table will be established by actual data and then the city can decide
when to implement the ERU count. For the present everyone will be charged one base
rate/ERU.

COPPER MEADOWS SUBDIVISION
The Copper Meadows Subdivision has been annexed into the city and therefore all of the

properties should be on a flat rate and not a metered rate.

MISC.
Bubba Ricker said Knife River is doing a really great job on this project.

Adjourned: 6:55 p.m.

APPROVE: Wanee ATTEST: Ly CLL AA 27

Text is extracted by machine from the official file linked on each page; the official file is the record. Sentinel Media, LLC.