Sentinel Media records · public agendas and minutes, text only, refreshed nightly from each body's own site · not a newspaper

City of Idaho Falls

City Council Work Session

minutes meeting date 2026-09-21 · fetched 2026-11-08 · 18799 characters · read by OCR, check numbers against the source · official file · plain text

City Council Work Session 
Meeting Minutes 
 
1 
 
680 Park Avenue 
Idaho Falls, ID 83402 
Monday, September 21, 2026 
3:00 PM 
City Council Chambers 
 
Call to Order and Roll Call 
There were present: 
Mayor Lisa Burtenshaw  
 
 
 
 
Council President Jim Francis 
Councilor Michelle Ziel-Dingman 
 
 
 
Councilor Jim Freeman  
Councilor Kirk Larsen  
 
 
 
 
 
Councilor Brandon Lee 
Councilor John Radford 
 
Also present: 
Wade Sanner, CDS Director 
 
 
 
 
Pam Alexander, Municipal Services Director 
Kerry Beutler, Assistant CDS Director 
 
 
 
Brian Cunningham, Asst Public Works Director 
Nick Terry, TOK Commercial Real Estate  
 
 
Chris Fredericksen, IF Power GM 
Zack Jones, City Attorney  
 
 
 
 
Linda Lundquist, City Clerk  
 
Mayor Burtenshaw called the meeting to order at 3:03 p.m. with the following items: 
 
Mayor, City Council – Discussion: Citywide updates, concerns, questions, reports: 
• 
Council discussed upcoming police neighborhood meetings being held in the City’s four police beats. 
Councilors were encouraged to attend and participate with residents. 
• 
Mayor Burtenshaw noted that the Police Department’s recent awards ceremony recognized 
numerous officers for heroic and exceptional service, with additional information expected in an 
upcoming departmental update. 
• 
Council discussed the continued usefulness of departmental highlights, with Councilors expressing 
support for receiving regular updates because they provide insight into activities occurring across City 
departments. 
• 
Councilor Radford provided an update on the City’s work toward an ordinance addressing electric 
bicycles, electric scooters, electric motorbikes, and other electric vehicles. The discussion focused on 
creating classifications that are practical for officers to enforce while addressing safety concerns. 
o 
Council discussed differences between lower-speed pedal-assisted e-bikes and higher-speed 
electric motorbikes with throttles. 
o 
Concerns were raised about children operating high-speed electric bikes and motorbikes on 
sidewalks and paths. 
o 
A local pediatrician had contacted the City regarding an increase in serious injuries to 
children, including traumatic brain injuries. 
o 
Council discussed potentially establishing speed limits on the Greenbelt and other pathways, 
improving signage, requiring users to warn pedestrians when passing, and addressing 
congestion in areas such as the Broadway Bridge. 
o 
Members emphasized that regulations should improve safety without discouraging bicycles 
and other electric vehicles as alternatives to automobiles. 
• 
Council discussed the possibility of meeting periodically with the Planning and Zoning Commission to 
review past cases and improve consistency in interpreting and applying City development regulations.

City Council Work Session 
Meeting Minutes 
 
2 
 
680 Park Avenue 
Idaho Falls, ID 83402 
• 
Mayor Burtenshaw raised concerns about vehicles blocking sidewalks, particularly affecting people 
with disabilities, wheelchair users, seniors and people with visual impairments. Police and Public 
Information staff were asked to consider enforcement and public education. 
• 
Council briefly discussed recent community events, including Symphony in the Park, the Downtown 
Street Party and the Day of the Arts. 
• 
State Representative Erin Bingham, also a member of the Gem State Housing Alliance, will be hosting 
local leaders to discuss expanding housing options in Idaho. Council is invited to the community 
conversation scheduled for October 19.  
Fire Department / Idaho Falls Power Updates 
• 
Councilor Larsen reported that the Fire Department had issued a Request for Qualifications for a 
feasibility study concerning potential consolidation of Idaho Falls Fire and Bonneville County Fire 
District No. 1. Responses were expected later in the week. 
• 
Council discussed an upcoming Fire Department block party at Station 1, including demonstrations, 
fire apparatus and food for the community. 
• 
Council noted that Idaho Falls Power performed well during the recent severe storm, with relatively 
few outages despite the conditions. Staff attributed part of the success to ongoing tree-trimming 
efforts, with the primary outage attributed to a lightning strike rather than a tree. 
• 
Council discussed a recent mobile-home fire on Ellsworth Drive in which firefighters rescued an 
unconscious resident. The resident remained hospitalized, while the resident’s dog died in the fire. 
• 
Members noted the unusually high number of structure fires recently and used the discussion to 
emphasize the importance of building, access and fire-safety codes, particularly when considering 
development standards and PUDs. 
 
CDS - Discussion: Serving Alcohol in Limited Commercial (LC) Zones  
Community Development Services — Serving Alcohol in the Limited Commercial (LC) Zone 
• 
Staff presented a proposed amendment to the LC zoning use table that would make standalone 
alcohol establishments a permitted use rather than requiring a conditional-use process. 
• 
Businesses would still be required to obtain the applicable state liquor/alcohol licenses, including 
compliance with separation requirements involving schools and churches. 
• 
The proposed change would also address situations such as businesses in the LC zone that want to 
offer limited alcohol service as part of their business, including spas, retail establishments or similar 
uses. 
• 
The proposal had already been considered and unanimously approved by the Planning Commission on 
September 1. Staff anticipated bringing the ordinance to Council in October after completion of the 
required notice period. 
• 
Council discussed concerns raised by the Police Department regarding the possibility of increasing the 
number of establishments serving alcohol, particularly if such establishments could be located closer 
to residential areas 
• 
Councilors supporting the change discussed: 
o 
The increasingly mixed residential/commercial character of LC areas. 
o 
The desire to encourage walkability rather than the concentration of alcohol-serving 
businesses in limited areas.

City Council Work Session 
Meeting Minutes 
 
3 
 
680 Park Avenue 
Idaho Falls, ID 83402 
o 
The similarity between limited commercial and the central commercial zones, where mixed-
use development and alcohol-serving establishments already exist. 
o 
Situations in which existing businesses have been unable to offer limited wine or similar 
service despite it being incidental to their primary business. 
• 
Staff noted that the principal policy question was whether Council wanted standalone alcohol 
establishments to be permitted in LC zones, while acknowledging the Police Department's concerns. 
 
 
Municipal Services, Legal, Parks & Recreation, Public Works - City Property Update: Bel Aire Division 3 and 610 
Water Ave  
Bel Air Division 3 / Vernon Lot 
• 
Director Alexander and Nick Terry of TOK Commercial provided an update on the approximately 8.6-acre 
City-owned property near Pinecrest Golf Course, also referred to as the Bel Air Division 3/Vernon Lot. 
• 
Council had previously authorized a letter of intent and purchase agreement with Clearstone, LLC, for 
approximately $2 million. 
• 
The agreement included several extensions, but the anticipated August 31 closing did not occur. The City 
subsequently issued a notice of termination and demanded the outstanding $10,000 extension payment 
or, in lieu of that payment, the developer's due diligence materials. 
• 
Clearstone had shown very little recent communication. The information received indicated that 
engineering work had revealed that fewer units could be developed than originally anticipated and that 
the developer had shifted priorities to other projects. 
• 
Staff had not received the developer's completed engineering, floor plans, plat information or other due-
diligence materials. 
• 
Council discussed the potential value of obtaining the developer's due diligence, particularly geotechnical 
and site information, because it could assist a future purchaser in understanding the property's 
development constraints. 
• 
The property was being returned to the market at approximately $1.9 million, with staff and TOK 
continuing to contact other potentially interested parties. 
• 
Potential future uses discussed included multifamily/townhome development and affordable housing. 
Staff noted that available Low-Income Housing Tax Credit allocations could affect the timing of an 
affordable-housing proposal. 
• 
Mr. Terry reported continued interest in the property but noted that financing conditions and interest 
rates were affecting developers' ability to move projects forward. 
• 
Staff recommended continuing to market the property, gathering letters of intent and bringing potential 
offers back to Council for consideration. 
• 
Council also discussed whether the City could use a redevelopment/RFP approach to help shape the type 
of development desired on the property. 
610 Water Avenue Property 
• 
Director Alexander provided an update on the City-owned property at 610 Water Avenue, including the 
history of its attempted sale. 
• 
The property had previously been appraised, with its value affected by the lack of a sewer connection. A 
public auction in April produced no bids, and a subsequent $30,000 offer was declined.

City Council Work Session 
Meeting Minutes 
 
4 
 
680 Park Avenue 
Idaho Falls, ID 83402 
• 
The property was then listed for approximately $65,000, with the buyer originally responsible for 
installing the sewer connection. Although there was substantial interest, the sewer requirement 
discouraged potential buyers. 
• 
Public Works identified an opportunity to install the sewer connection in conjunction with other nearby 
construction associated with the Boulevard/Birch Street roundabout. 
• 
The City obtained a change-order price of $15,898.75 for the sewer connection and proceeded with the 
work. A new meter pit and sewer stub were installed during the week of September 8. 
• 
Because the property is owned by the City (public works), proceeds from the eventual sale would return 
to that department. 
• 
The City received a $54,000 offer on September 12. Staff recommended declining the offer because it 
would provide little recovery beyond the City's sewer-installation expense. 
• 
The property remains listed at $65,000, now without the previous sewer-connection requirement for the 
purchaser. 
• 
Council discussed the length of time the property had been listed and the possibility of temporarily 
removing and relisting it to generate renewed interest. 
• 
Staff indicated that the property could potentially be worth approximately $65,000–$70,000 with the 
sewer connection now installed. 
 
 
Mayor’s Office, CDS, Legal - Discussion: Planned Unit Development (PUD) 
• 
Council discussed three main options for the ordinance: 
o 
Rescind the existing PUD ordinance and develop a new approach. 
o 
Place a temporary moratorium on new PUD applications. 
o 
Keep the existing ordinance and make targeted, incremental amendments. 
• 
A moratorium raised concerns about disrupting projects already in progress. 
o 
Staff noted that several developers were already working on PUDs in anticipation of potential 
ordinance changes. 
o 
Council discussed whether a moratorium could create unnecessary uncertainty or interrupt 
projects that had already been planned under the existing rules. 
• 
There was discussion of taking a more targeted approach. 
o 
Rather than rewriting the entire ordinance at once, Council could address specific problems 
individually. 
o 
Potential amendments included clearer definitions, setbacks, private-road standards, 
neighborhood compatibility, amenities and maintenance requirements. 
• 
The October 6 Planning Commission hearing became an immediate procedural issue. 
o 
A proposal to rescind the PUD ordinance had already been noticed for the Planning Commission's 
October 6 meeting. 
o 
Council could decide whether to proceed with that hearing, postpone it while staff develops 
amendments, or allow the Planning Commission to hear the matter and provide a recommendation. 
• 
The discussion ultimately identified several areas needing further work, particularly: 
o 
Private versus public roads 
o 
How PUD standards relate to the underlying zoning 
o 
Definitions and code clarity 
o 
Setbacks and building height 
o 
Amenities and open space

City Council Work Session 
Meeting Minutes 
 
5 
 
680 Park Avenue 
Idaho Falls, ID 83402 
o 
Long-term HOA and infrastructure maintenance 
o 
Predictability for developers 
o 
The overall PUD application and hearing process. 
Council did not reach a final decision on whether to eliminate the PUD ordinance. The discussion centered on 
whether the City's concerns could be addressed through targeted amendments and process improvements 
rather than immediately replacing the entire PUD system, while also considering the already-scheduled 
Planning Commission hearing and the effect of any changes on developers currently working on projects. 
 
 
There being no further business, the meeting adjourned at 6:06 PM. 
 
 
 
/s/ Linda Lundquist_________________ 
 
/s/ Lisa Burtenshaw 
_____________ 
Linda Lundquist, City Clerk 
 
 
 
Lisa Burtenshaw, Mayor

9/21/2026

City of Idaho Falls —

City Property Update

Bel Aire Division 3
610 Water Avenue

Monday, September 21, 2026

IDAHO FALLS

Commercial Broker — Nick Terry,
TOK

Thursday, September 11, 2025 —
Letter of Intent to Purchase from
Clearstone, LLC. Approved by City
Council.

Purchase and sale agreement
signed October 24, 2025

Three addendums: Notice of
exercise to extend options issued
(4/9/26); (5/11/26); (7/6/26)

Closing date — August 31, 2026
Termination Notice issued 9/1/26

9/21/2026

ic. Bs. Crna

= Anderson Str
eas La 4 eS

Vernon Ave,

= 7 ot '-/ aa - oi —
Pinecrest Golf, Course : Sie ; Wheelenst ra

MB a Le

Offer Proposed Development Terms:
Earnest Money Due Diligence
Closing

Clearstone, LLC $2,000,000 Townhomes 120-days
$10,000 non-refundable 1 option of an additional 30-days with another
$10,000 deposit;
Expedited request for zoning, platting, lot
adjustments, permitting process prior to
closing
Close 30-days after due diligence

Hawkins $1,900,000 Multi-family 180-days
$20,000 refundable 2-60-day extensions, with $10,000 non-
refundable deposit within 30-days of the end
of due diligence
Expedited request for zoning, platting, lot line
adjustments
Close within 30-days of due diligence

Mach, LLC $1,650,000 Affordable Housing; will require  180-days
$20,000 refundable a low-income housing tax credit 2 options of 60-day extensions with $10,000
(approximately a 6-month deposit each extension
process) No later than 60-days after due diligence

9/21/2026

610 Water Avenue

/

Questions

Council Direction to Staff

Underlying Zone Give-Ups

What the city gives up in exchange for the higher standards required elsewhere in the PUD

Underlying zone give-ups

4%

Keep or amend?

Current Code Position Council's Options

Lot Size No minimum within a PUD Keep as-is (core PUD flexibility), or set a floor if internal lots are getting too small
to function
Density Fixed by Table 11-2-4; no council discretion to exceed Keep the table as the hard ceiling, or amend the per-zone numbers
Setbacks Hard floor at the perimeter (can't go below adjacent non-PUD Keep case-by-case, or set a defined minimum internal setback, or set a minimum
setback); internal setbacks case-by-case for PUDs adjacent to undeveloped ground
Height Underlying zone max, +1 ft height per 2 ft added setback Keep the 2:1 ratio, change the ratio, or cap total additional height regardless of

setback offered

Higher Standards Required

Higher standards

11 items the city gets (combined amenities and phases removed parkinglots

Keep or revise?

| Known Gap or Question

| Higher Standard

Common space (25% minimum)

Scaled amenities (1 per 50 units) — phased delivery

Enhanced landscaping

Buffers (10' + fence/hedge)
Superior streetscapes
Height/massing sensitivity
Architectural quality standards
Pedestrian connectivity

Unified maintenance responsibility

Open question: what % of the 25% should be allowed from drainage facilities? Currently uncapped

No construction-grade standard except playgrounds, Dog parks have requirements, amenity required for
certificate of occupancy

Underlying zone is 20% - increases to 25% Additional trees and bushes are required landscaping plans must
be included

7 foot to a 10 foot buffer

Has not been overly strict other than through landscaping

Elevations are provided - Staff resolves this and is addressed at staff level (very technical)
Subjective language (“high quality design”) — could be tightened with specific criteria

Is only better when a trail system is part of an amenity and not just normal circulation

HOA responsible for maintenance and replacement

Concern

Amenity construction standard

Retention basin / common space
credit

Private road maintenance

Private road emergency access / fire
lanes

Drive aisle safety

Unaddressed Concerns —

Proposed Fix

Commercial-grade construction for all amenities (not just
playgrounds); reserve study/escrow for replacement

Cap % of the 25% that can be drainage-based; require drawdown
analysis, max 5:1 slopes, pedestrian connectivity

City’s right to cure with a cost recovery -A condition allowing the city
to step in and perform necessary maintenance if the HOA fails to act
after notic

26' min. unobstructed width, mandatory fire lane designation,
signage/striping, enforcement independent of HOA, retrofit trigger

Sight-triangle compliance, physical separation at crossings, routed
trash/loading access, capped dead-end length, lighting plan

A/B/C Judgment Call

Only playgrounds currently require “commercial” grade.
Reduce the number of amenities allowed

Cap percentage is an open question

Largely ready to become ordinance language (ties to Section
3(a) unified control)

Draft language already exists — needs Fire Marshal sign-off on
the 26' figure and IFC alignment

Largely engineering-standard items — decide if these belong in
this ordinance or the public works manual

Underlying zone give-ups

4 items city gives up

¥

Keep or amend?

Per-item council vote

S

Keep flexible as-is

Or add firmer standards

Higher standards

11 items city gets

S

Keep or revise?

Per-item council vote

S

° Keep current requirements °

° Or strengthen / remove items .

One council decision

Unaddressed concerns

5 open risk areas

S

Amend or condition?

Or take no action

S

Amend ordinance (uniform)

Or leave as CUP condition

Amend the ordinance sections that changed; leave the rest as-is

Text is extracted by machine from the official file linked on each page; the official file is the record. Sentinel Media, LLC.