Ririe Joint District #252

03.2. School Board OFFICIAL MARCH Special Meeting Minutes 3-10-26.pdf

minutes meeting date 2026-03-10 · fetched 2026-09-17 · 14676 characters · official file · plain text

Ririe Joint School District 252 
Tuesday March 10, 2026 
2:00pm 
  Special School Board Meeting Minutes 
 
 
 
2:00 pm – The Ririe Joint School District #252 Board of Trustees met on Tuesday March 10, 2026 at 2:00 pm in the 
School Board Room for a Special School Board Meeting.   
 
2:01 pm – Board Chair Hansen welcomed all those in attendance and asked everyone to please rise and repeat the 
Pledge of Allegiance.  All did so.   
 
2:01 – Board Chair Hansen asked that roll call be taken.  Roll call was taken and those in attendance were as 
follows:  Board Chair Mike Hansen, Trustee Kevin Landon, Superintendent Jeff Gee, Business Manager Trapper 
McCallister, and Board Clerk Kristi Hamilton.  Assistant Treasurer Darby Taylor was present via phone for the 
beginning of the meeting.  Trustee Brigham Cook was not present at this time.  Vice Chair Dallin Howell was not 
present for the meeting today.  
 
2:02 pm - Board Chair Hansen entertained a motion to set and adopt the special agenda.  Kevin made a motion to 
set and adopt the special agenda as posted.  Darby seconded; passed unanimously.  
 
2:03 pm – Item 5/New Business 
a. Discussion/Action Item – AG Building Bids.  Representatives from Bateman Hall gave the Board a handout 
and asked Superintendent Gee to bring the information up on the overhead.  They thanked the Board for 
the opportunity to sit down with the Board and go over where the numbers came in at for the new CTE/AG 
Building.  They informed that they have already reviewed most of this with Trapper and Kevin.  They 
informed that they have checked and confirmed all sub-contractors to make sure they are licensed, etc…  
They informed that there were some things they found were doubled up as far as the scope of work.  They 
explained.  They informed that they are ready and excited to get things started.  Kevin commented that he 
is concerned about one of the bids.  Bateman Hall informed they will go over that information shortly.  They 
commented that sometimes when going through this process they find mistakes and the sub-contractors 
won’t honor their bids, but none of that has happened with this.  2:05 pm – Darby arrived at the meeting.  
Bateman Hall informed that they want to go over each number to be transparent and an open book with 
the Board.  They informed that the numbers highlighted in green are either under contract or have been 
confirmed.  He explained further.  They informed that they have tightened everything up as best they 
could.  They informed that the metal building has been secured and the design has already been worked 
through and it should be here in April.  They informed of the vault which is part way designed.  They 
commented it is uncommon to have it on a fire line.  They commented that this is something from the City 
of Ririe that they don’t typically see anywhere else.  They explained further.  2:07 pm – Brigham arrived at 
the meeting.  Bateman Hall continued to explain the remainder of the spreadsheet, commenting on the 
windows, doors, hardware, roofing, millwork, rough carpentry, masonry, overhead doors, framing, gypsum, 
acoustical ceilings, paving, flooring ceramic tile, specialties, fire suppression, plumbing, HVAC, electrical, 
chain link fence and gates.  They explained each in detail.  They informed that fire suppression wasn’t

initially in the bid, but Bonneville County required it be added.  Discussion occurred.   Bateman Hall 
informed that they also added some contingency funds for unexpected things that might come up.  They 
informed that whatever funds are not used will 100 % go back to the district.  They informed that originally 
they had a larger amount in the weather protection code, but lowered that due to the weather this year.  
They talked about landscaping repairs, and the bulldog signage.  They commented if the district doesn’t 
want that or any other items, they can drop them.  They explained.  Discussion occurred.  Bateman Hall 
then talked about carpentry, the construction fence, general labor and cleanup, SWPPP maintenance, final 
cleaning, caulking and punch list, construction plans, special inspections, and PEMP extras.  They then 
commented on the final costs and explained the overall budget.  They informed that as per this 
spreadsheet the overall costs total $3,388,955.00.  They reminded that this total includes the contingency 
fund also.  They commented that they understand that this number pushes the district over the budget that 
they were planning on.  They commented that there are items the district can look at to lower the overall 
total amount.  They read over the pages and explained in detail.  They informed that there is a possibility of 
lowering the overall cost by $180,390.24.  Discussion occurred.  Trapper informed that he and 
Superintendent Gee have gone over everything in detail to figure out how to make things work.  He 
explained that $1,000,000 will come from the school modernization funds that were received last year, 
which can only be used on capital projects.  He informed that the district received approximately 
$3,000,000 that the district put into a savings account that has been earning interest.  He informed after 
this project, the district will still have approximately $738,000 left, which will continue to grow and earn 
interest for other capital projects.  Trapper informed of some capital projects that have already been taken 
care of.  Discussion occurred.  Brigham commented that the district originally budgeted $2,300,000 for the 
CTE/AG Building.  He asked how much was added from then.  Trapper explained that an upstairs was 
added, wainscot brick on the outside, finishing 3 sides of the building, 6 classrooms, etc…. Trapper informed 
that the initial budget was $2,300,000, however, as they continued to discuss the building they knew that 
the cost would go up.  He explained.  Bateman Hall commented that the number discussed after everything 
added was $2,900,000.  Discussion occurred.  Kevin commented that we want to make sure we do the 
building right.  Superintendent Gee agreed, and commented that he worries if we start cutting too much 
out we will regret it.  He commented that there are probably some things we can take off the list that we 
really don’t need, but we need to be careful and mindful of what we cut.  Discussion occurred regarding the 
windows, ceiling tiles, etc… Kevin asked some questions about the windows.  Jeff commented that he thinks 
we should keep the HVAC and what is in the bid from Climatech, which makes all of our buildings on the 
same system.  He commented if he had to choose, he would eliminate Tectum and keep Climatech.  He 
explained further.  Discussion occurred on display cases, aluminum windows, epoxy paint on the floors, and 
wainscot up to 4ft.  Brigham commented that he would eliminate all the tile and have polished cement like 
is in the other buildings.  The Board continued to discuss items that could be removed from the list.  
Superintendent Gee commented that he would like to leave the canopy over the front entrance and keep 
the windows.  Brigham commented that he thinks we need a minimum of 4 windows, maybe 6.  He 
commented that we could cut them in half and still have enough for what is needed.  Discussion occurred 
Comment was made that the little cuts are pennies compared to the total cost.  Discussion occurred.  
Discussion occurred regarding eliminating the ceiling panels and do a drywall ceiling, which with that and 
the other discussed cuts, it would bring the total cost down closer to $3,000,000.  Discussion occurred.  
Bateman Hall commented that they can redo the spreadsheet and send the updated sheet to Trapper.  
They commented that they have an invested interest here also and as things develop they will continue to 
keep looking at ways to cut more costs.  Discussion occurred.  Bateman Hall commented that with a project 
like this there is usually a person who can represent the district for any unforeseen or added expenses 
without having to call a full Board meeting for every item that comes up unexpectedly or at the last minute

that needs to be dealt with quickly.  Discussion occurred.  Bateman Hall commented that they need to 
know if there is anything else the district wants to make sure happens that isn’t on or list or hasn’t been 
discussed.  They commented that they would like to get contracts out, and start moving dirt.  
Superintendent Gee reminded everyone that the facility funds money is only there to do capital projects.  
He commented that we cannot replace a toilet, pay a teacher’s salary, or anything other than capital 
projects.   He commented that the only thing we can do with those funds is build.  Brigham commented 
that he is a little leery using it because we have another building coming up in the future.  Kevin 
commented that we are invested in the CTE/AG Building now and it needs to be finished and done 
correctly.  Board Chair Hansen asked some questions about Bonds.  Superintendent Gee informed that we 
can Bond to build but not to finish.  He commented again that the money has been set aside to build capital 
projects.  Kevin commented that he is good with using the funds available and recommends we move 
forward with the CTE/AG Building.  Brigham commented that he has concerns with the big fans, and thinks 
they can be added later.  Kevin commented that will never happen.  Superintendent Gee explained how the 
HVAC and Climatech system works.  He commented that we added this system back into every building for 
a reason.  Brigham commented that he understands that, but wants to feel better about it.  Discussion 
occurred.  Board Chair Hansen asked if Bateman Hall has a better picture/drawing of the building.  Darby 
asked if brick has to be on all sides.  Bateman Hall replied no, but aesthetically it looks better.  They 
commented that they could eliminate it on the 4th side.  Discussion occurred.  Kevin commented that we 
want it to look nice.  Superintendent Gee commented that he likes what has been discussed and done in 
this meeting today.  He commented that he and Trapper are financially comfortable with where we are at.  
Bateman Hall commented that they need to know if they are going in the right direction and if the district is 
comfortable with $3,000,000.  Bateman Hall read over the changes.  Discussion occurred.  Brigham asked 
about the chain link fence.  Superintendent Gee explained that rather than building a tool room, they will 
have the tool area fenced off.  He commented that Rigby did that in their shop and Jake and Jon thought 
that was a good idea.  Superintendent Gee informed that the original grant he wrote and was awarded was 
for $2,800,000 and he and Trapper are confident they can make adjustments and come up with the 
remaining funds needed.  Board Chair Hansen entertained a motion.  Kevin made a motion to approve and 
direct Bateman Hall to move forward with the CTE/AG Building as presented today, with discussed changes 
made, for an amount not to exceed $3,000,000.  Brigham seconded; passed unanimously. 
b. Discussion/Action Item – HS Boys Basketball Coach Update.  Superintendent Gee informed that he wanted 
to keep the Board in the loop of where they are at with this.  He informed that the Administration is pretty 
happy with how things worked out this year.  He informed that he has had a couple of conversations with 
Jordan Hamilton and feels like if Jordan is interested in remaining as the HS Boys Head Basketball Coach, 
they would like to keep him in that position.  Brigham commented that he understands, but feels like since 
he was appointed this year, he would still like to open the position and take applications for the position.  
Darby agreed.  Kevin commented that he is happy with the job Jordan has done for the past 14+ years, but 
if the process is to open the position up, then that is what it is.  Superintendent Gee commented that he 
feels like Jordan stepped back into the position as a courtesy to the district when things changed two weeks 
before the season began, and Jordan did a great job and he would like to keep him if he wants the position 
again.  Brigham asked if this could be talked about at the next meeting.  He informed that he isn’t prepared 
to discuss this today.  He asked how big of a deal it is if we wait another week or two to discuss this.  Kevin 
commented that he doesn’t know what was discussed before within the Board regarding this, but he agrees 
with Superintendent Gee.  He commented that he is happy with the job Jordan has done and wouldn’t be 
afraid at all to offer the position to him if he wants it.  Discussion occurred.  Superintendent Gee 
commented that the year prior to this was tough for several reasons, and for Jordan to come back and take 
over two weeks before the season began says a lot.  Darby commented that no one is disputing that Jordan

did a good job, but rather that the previous Board said they would re-post the position once this year’s 
season was over.  Discussion occurred.  Brigham commented that he needs more time to think this over.  
Board Chair Hansen commented that he thinks it needs to be posted because that is what they said they 
were going to do.  He asked the Board to think this over and discuss it at the next regular meeting.   
c. 
Discussion/Action Item – Supplemental Levy Meetings.  Superintendent Gee asked the Board how much 
they want to be involved in the meetings.  He commented that Parent-Teacher Conferences are coming up 
and he and Trapper plan to be at the buildings to talk to patrons about this.  He informed that the 
Supplemental Levy Information Pamphlets will be available to hand out also.  He asked all Board Members 
who would like to be at Parent-Teacher to help with this to please come sometime between 4:30 -7:00pm 
on March 17th & 18th at both the Elementary and Jr/Sr High Schools.  He then asked the Board if any of 
them were interested in hosting an Information Meeting at their home or somewhere else to let him know.  
He commented that those meeting should be scheduled closer to the May election.  Board Chair Hansen 
asked how it runs.  Superintendent Gee explained.   
 
3:40 pm – Kevin informed that he will not be at the Work Meeting or Regular Meeting on March 19th. 
 
3:40 pm – There being no further discussion in tonight’s meeting, Board Chair Hansen entertained a motion.   
Brigham made a motion to adjourn.  Darby seconded; passed unanimously. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Reviewed & Approved:  April 16, 2026 
Board Chair:  Mike Hansen 
Board Clerk:  Kristi Hamilton